Mr. Eric Bollinger, DynCorp International contractor, checks his technical orders while working on a C-21 during a phase inspection at Scott Air Force Base, Ill., on Sept. 15, 2010. The phase inspections are done on aircraft after they reach flying milestones to ensure the aircraft remain in top condition. (U.S. Air Force Photo/Staff Sgt. Brian J. Valencia)