Transfering Propane to Base Pipeline
Kenneth Palm, 319th Civil Engineer Squadron heat ventilation and airconditioning technician (left), monitors Keneth Edman, Wayne Inc. Transports driver(right), as he tightens a hose to the base’s synthetic natural gas farm pipepline, Jan. 27, 2014 on Grand Forks Air Force Base, N.D. Edman was transporting nine thousand and two hundreed gallons of propane from Carrington Pipeline, N.D. to Grand Forks AFB, N.D. (U.S. Air Force photo/Senior Airman Xavier Navarro)